Pay in 4 interest-free payments of $7.86 Learn more
Shipping Estimate
USA
- USA
- CAN
- USA
- CAN
Ships within 48 hours · Estimated delivery Sep 8 - Sep 13
Pay in 4 interest-free payments of $7.86 Learn more
Ships within 48 hours · Estimated delivery Sep 8 - Sep 13
3 pole can motor providing smooth slow speed running and a realistic top speed
Hoover compartment can be easily emptied
Crowned as Model of the Year when they were first introduced
British Rail awarded the contract to design and build these new engines to Brush Traction in Loughborough
Operating Number boards
2P-009-301 MK3 Loco Hauled Blue/Grey Standard M12017 Class_Class 14 3 pole can motor providingMk3 Locomotive Hauled Coaches The British Rail Mk 3 coach was developed primarily for the Class 43 HST, but incorporated design features to enable it to be hauled by conventional locomotives. The first coach entered service in 1975 and the last were made in 1988. Most Mk. 3 coaches built are still in service today, including the Royal Train. Specifications Highly detailed Body, underframe and bogies Light bar ready NEM Coupling Finely applied livery
US$ 165.00
US$ 127.50
US$ 145.00
US$ 165.00
US$ 85.00
US$ 132.50
US$ 45.00
US$ 175.00
US$ 165.00